Skip to main content

Paints and coatings, the same colour every batch.

Paints, coatings and adhesives in many colours and in small batches. Frontlink guides weighing and tinting per formulation, records every correction and keeps each batch reproducible.

The weighing room, portion by portion.

Mixing starts with weighing. Frontlink splits the order into portions that fit the mixer, checks every weighing and prepares the charge protocol.

  1. 1 / 7The order

    An order for 480 kg of day cream. The materials and quantities come from your ERP.

  2. 2 / 7Portions for the mixer

    The mixer takes 300 kg. Frontlink splits the order into two portions of 240 kg, in the same proportions.

  3. 3 / 7Scan what gets weighed

    The operator scans each lot. Only what was issued to this order may go on the scale.

  4. 4 / 7Within tolerance

    The emulsifier weighs 19.41 kg, above the limit. The screen stops it. Proceeding is only possible with a supervisor's approval.

  5. 5 / 7Surplus back

    Weighed too much? The surplus is reversed and goes back to stock, with the right lot.

  6. 6 / 7Ready for mixing

    All materials of the portion are weighed and within spec. The portion is ready for the mixer.

  7. 7 / 7The charge protocol

    Tolerance, in-process measurements, visual check and the assessment, signed off by the team lead.

The order. An order for 480 kg of day cream. The materials and quantities come from your ERP.

Example with fictional data.

What is different in this industry.

  1. Colour that matches

    A batch is tinted until it matches the standard. Frontlink records every correction, so the next batch starts closer and you see which bases need the most tinting.

  2. Small batches, many changeovers

    Short runs mean frequent cleaning of mixers and fillers. Frontlink plans colours from light to dark and records each cleaning.

  3. Viscosity and solids

    Viscosity, density and solids are measured per batch. A result outside the norm stops the batch before it is filled.

What it looks like in practice.

A customer reorders a coating in RAL 7016. Frontlink shows the previous batch with its two tinting corrections, so the new batch starts from the corrected formulation and is right the first time.

Example with fictional data.

Batch 5507 · coating RAL 7016Colour approved
  • Base weighed per formulation v908:30
  • Tinting correction 2, black +0.3%10:10
  • Colour measured against standard10:40

Frequently asked questions.

Can we record tinting corrections?

Yes. The operator records each addition at the line, and Frontlink keeps it with the batch and shows the history per colour.

Does Frontlink calculate the cost per batch?

Yes. Actual consumption, corrections included, gives the real cost per batch and per order.

Do two-component products work?

Yes. Each component is its own batch and the order links them, so traceability covers both.