Mixing and filling to order, without guesswork.

Formulations, mixing orders and filling to order, with the right documents per batch. Frontlink puts the formulation and steps at the line, records consumption and checks, and shows what a batch really cost.

The weighing room, portion by portion.

Mixing starts with weighing. Frontlink splits the order into portions that fit the mixer, checks every weighing and prepares the charge protocol.

  1. 1 / 7The order

    An order for 480 kg of day cream. The materials and quantities come from your ERP.

  2. 2 / 7Portions for the mixer

    The mixer takes 300 kg. Frontlink splits the order into two portions of 240 kg, in the same proportions.

  3. 3 / 7Scan what gets weighed

    The operator scans each lot. Only what was issued to this order may go on the scale.

  4. 4 / 7Within tolerance

    The emulsifier weighs 19.41 kg, above the limit. The screen stops it. Proceeding is only possible with a supervisor's approval.

  5. 5 / 7Surplus back

    Weighed too much? The surplus is reversed and goes back to stock, with the right lot.

  6. 6 / 7Ready for mixing

    All materials of the portion are weighed and within spec. The portion is ready for the mixer.

  7. 7 / 7The charge protocol

    Tolerance, in-process measurements, visual check and the assessment, signed off by the team lead.

The order. An order for 480 kg of day cream. The materials and quantities come from your ERP.

Example with fictional data.

Portions that fit the mixer.

An order is often bigger than the mixer. Frontlink splits it into portions that fit, with every material in the same proportion.

Order 480 kg
Portion 1 · 240 kg
Mixer 02 · max 300 kg
Portion 2 · 240 kg
Mixer 02 · max 300 kg
  • Water 70%
  • Glycerine 12%
  • Emulsifier 8%
  • Other 10%

Every portion gets its own weighing and its own protocol.

Too much or too little stands out.

A tolerance per material. If the operator weighs outside it, the screen says so at once, and it doesn't just go through.

Emulsifier · target 19.20 kg
19.1019.30
  • 19.22 kgWithin tolerance
  • 19.41 kgOut of tolerance
  • Stopped

    A weighing outside tolerance doesn't go through.

  • Proceed with approval

    Only a supervisor can accept a deviation, and that is recorded.

  • Surplus back

    What is too much is reversed and goes back to stock.

The charge protocol, digital.

The protocol you fill in on paper today, as a form on screen. With the limits built in, the in-process measurements and the team lead's sign-off.

Charge protocol · Day cream base · portion 1
Tolerance0.5%
Lower limit19.10 kg
Upper limit19.30 kg
IPC pH5.6
IPC viscosity12,400 mPa·s
Visual checkOK
Batch assessmentApprovedRejectedQuarantine
Co-signed by team lead · J. Bakker

Safety data sheets with the lot.

Suppliers send safety data sheets, specifications and certificates. Frontlink recognises which document it is and links it to the right item and lot.

  • SDS_Emulgator_EM.pdfSafety data sheetEmulsifier · EM-1182
  • Spec_Glycerine.pdfSpecificationGlycerine
  • CoA_GL-3310.pdfCertificate of analysisGlycerine · GL-3310

If Frontlink is unsure what kind of document it is, it stays undetermined until someone looks.

Frequently asked questions.

Can we manage formulations per customer?

Yes. Per product and customer you record formulations and norms, with versions approved before they reach the floor.

Does Frontlink see overfill?

Yes. Actual consumption against the formulation per batch, so you see where material is lost.

What about safety information?

Frontlink prepares the right documents per batch and per product at delivery. We agree with you which documents are needed.