Skip to main content

What is an MES? An explanation for manufacturers

An MES (Manufacturing Execution System) is software that directs and records production on the shop floor: which order runs on which line, with which materials and lots, who did what, which checks were carried out and where time was lost. It sits between the ERP, which plans and invoices, and the machines and people who do the work.

Updated September 30, 2026

What an MES does

An ERP knows that 12,000 bottles have to be filled for a customer this week. An MES knows that line 2 has been stopped for a changeover since a quarter past ten, that the eleven o'clock fill weight check passed, and which lot of sugar syrup went into batch 88213.

In the ISA-95 standard, which describes the layers of a factory, the MES sits at level 3: manufacturing operations. Above it is the ERP (level 4), below it the control of machines and sensors (levels 0 to 2).

The tasks an MES usually takes on:

  • Turning orders from the ERP into a plan per line and per day
  • Showing operators the work instructions and the right steps
  • Recording materials, lots and consumption, so every batch can be traced
  • Capturing quality checks during production, including deviations
  • Tracking speed, downtime and its reasons, and calculating OEE from them
  • Assembling the batch record or production report from what actually happened
  • Reporting finished goods, consumption and hours back to the ERP

MES or ERP: what is the difference?

An ERP runs the business: sales orders, purchasing, stock value, invoices and the broad lines of the plan. It thinks in days and weeks and knows what should happen.

An MES runs execution: what happens on the floor this minute and what was actually made, consumed and checked. It thinks in minutes and hours and knows what really happened.

Most manufacturers need both. The MES takes orders and items from the ERP and reports back what was produced, so stock and invoices are right without anyone retyping anything.

When do you need an MES?

There is no fixed company size above which an MES pays off. It comes down to signs in the daily work:

  • The plan lives in Excel next to the ERP and falls behind as soon as something moves
  • Work orders, checklists and handovers are on paper and retyped later
  • The batch record is pieced together after the fact
  • Nobody knows how far an order is without walking the floor
  • Tracing a lot after a complaint takes hours or days
  • Nobody can say how much production time is lost, or why

MES and WMS: production and warehouse together

A WMS (Warehouse Management System) runs the warehouse: locations, lots and shelf life, receiving, picking and shipping. In companies that make to order, warehouse and production are intertwined: materials are picked for an order, consumed at the line and stored again as finished goods.

Many companies therefore buy two systems and connect them. Where they meet, in picking for production, consumption per lot and reporting back, the very gaps you wanted to close appear. One platform for production and warehouse avoids them.

What to look for when choosing an MES

A few questions that separate an MES people use from one that ends up in a drawer:

  • Does it connect both ways with your ERP, such as Exact Online or Business Central?
  • Do operators like using it on a tablet at the line, without long training?
  • Can you start with one process instead of everything at once?
  • Are traceability and the batch record built in?
  • Does the factory keep working if the internet drops for a while?
  • Can you reach your own data through an open API?

Frequently asked questions

What does MES stand for?

MES stands for Manufacturing Execution System: software that directs and records the execution of production on the shop floor, between the ERP and the machines.

Is an MES the same as an ERP?

No. An ERP manages orders, purchasing, stock and invoices and plans in days and weeks. An MES directs and records what happens on the floor, in minutes and hours. They work together: the MES takes orders from the ERP and reports back what was made.

Does a small manufacturer need an MES?

It depends less on size than on the signs: planning in Excel, paper work orders, batch records assembled afterwards or no view of downtime. Then it pays to start with one process.

How long does it take to introduce an MES?

That varies a lot by system and approach. With Frontlink you start with one process, built at your site by an engineer; it is usually running within a few weeks, and the next process follows.

Curious how this works for you? Bring us one process.

In a 30-minute call we look at one of your processes and show how Frontlink handles it.

Book a call